Location:
Banha
Consultant:
ACE (Moharram Bakhoum)
Year of construction:
2010
Project description:
Bauer is awarded to execute the Banha Bridge, it is the first time in Egypt to be implemented piles with diameter 2 m in watercourse.
Scope of Works:
Pilling works
• 1500 linear meter of piles with diameter 2,000 mm, length 47 meter allowable compression load 1650 tons.
BAUER EGYPT S.A.E.
Specialised Foundation Contractors
197, 26 July Street
El Mohandeseen
Cairo
Phone: +20(2)33026083
Fax: +20(2)33023805
E-Mail: baueregypt@baueregypt.com
© by BAUER Aktiengesellschaft. All rights reserved.