Location: Damietta Port, Egypt
Client: Methanex
Year of construction: 2008
Project description:One ff the largest petro jet project at Damietta port to construct Methanol factory, Bauer executed 390 no. of pile with diameter 800 mm and 37 m length and 260 no. of 600 mm diameter with length 37 m.