Location:
Cairo
Client:
OCI BESIX
Year of construction:
2008
Project description:
The biggest largest project in year 2008 at Cornish EL-Nile
Scope of Works:
• About 335 no. of bored piles with diameter 1,000 mm and depth 28 m
• Construct of about 11,790 m2 of diaphragm wall with thickness 800 mm and depth 35 m to deep excavation up to 14 m deep
• Post grouted ground anchors:
1st row above ground water table about 192 no. of anchors. 2nd row below ground water table about 383 no. of anchors.
• Ground water control by using dewatering system
• Pile load test on piles up to 1440 ton
• Sonic coring test