Location:
Giza
Client:
Union national bank
Year of construction:
2013
Scope of Works:
• Diaphragm Wall Works
Construct diaphragm walls with thickness 800 mm. Depth of walls is up to 28 meter. Total quantity of executed diaphragm wall is 3,760 square meter.
• Soft Gel Grout Plug Works
Grout a soft gel plug at a depth of 28 meter from the street level. Plug thickness 2 meter. Grouted area is 2,400 square meter.
• Bored piles works
90 no. of piles with dia. 1,500 mm and 1,000 mm and depth 32 m.
BAUER EGYPT S.A.E.
Specialised Foundation Contractors
197, 26 July Street
El Mohandeseen
Cairo
Phone: +20(2)33026083
Fax: +20(2)33023805
E-Mail: baueregypt@baueregypt.com