Bauer Egypt was commissioned for the Al Wasta Nile Bridge project to enhance the region’s infrastructure. Bauer Egypt was entrusted with the challenging task of offshore piling for the bridge’s foundation. The scope of work included the installation of 500 piles with a diameter of 1,000 mm, reaching depths of 20 m, along with 100 piles of 1,500 mm diameter, driven to a depth of 45 m. Additionally, offshore trial pile testing was conducted to ensure the integrity and stability of the foundation for this critical structure crossing the Nile.

Facts about the project
Company :

BAUER EGYPT S.A.E. Specialised Foundation Contractors

Location :

Al Wasta, Beni Suef, Egypt

Project name :

Al Wasta Nile Bridge

Period :

February to October 2004

Services :

Bored Piles