References
Have you ever wondered how great projects become reality? Then you've come to the right place. Because we are building the world of tomorrow. Discover our success stories, innovations and the result of outstanding collaboration. Our projects inspire and reflect our passion for excellence. Find out how we turn our customers' visions into reality and deliver top performance in the process. Your next success story could start now!
Bauer Egypt executed 160 barrettes and rigorous load tests for a key foundation project in Libya, ensuring stability and strength for future development.
Bauer Egypt executed essential foundation and groundwater control works for Cairo Metro Line 3 Phase 3, which features 15 stations.
Bauer Egypt executed crucial geotechnical works, including diaphragm walls and grout plugs, for the Suez Canal twin tunnels project in Ismailia.
Bauer Egypt played a key role in constructing the Ismailia Tunnels beneath the Suez Canal, utilizing TBMs and ground freezing for safe excavation.
Bauer Egypt constructed four deep shafts, grout plugs, and micro piles for the Twin Syphon tunnels under the New Suez Canal, ensuring structural stability.
Bauer Egypt strengthened the New Assiut Barrage with Cut-off and Diaphragm walls to secure the water needs of the present and future generations.
Bauer Egypt executed crucial foundation and soil treatment works for Cairo Metro Line 3, Phase 4, enhancing the stability of four key stations.
Bauer Egypt was tasked with executing the complex piling for the Aswan Nile Bridge, securing the foundation to ensure structural stability across the Nile.
Bauer Egypt executed crucial foundation and groundwater works for Cairo Metro Line 3, Phase 2, ensuring stability across four key underground stations.
Bauer Egypt installed over 400 plastic and reinforced piles, ensuring the foundation stability of the new Assiut Barrage.
Bauer Egypt executed 2,000 mm diameter piles for Banha Bridge over the Nile, a first in Egypt's watercourse construction, ensuring a strong foundation.
Bauer Egypt delivered essential pile foundations for the West Damietta Power Plant, installing 22,000 lm of piles to support key infrastructure and buildings.