Foundation work for Aswan Nile Bridge

Piling for Progress

The Aswan Nile Bridge required specialized offshore piling solutions to ensure the stability of its foundation. Bauer Egypt was tasked with executing the complex piling works, including the installation of 24 offshore piles with a diameter of 2 m at a depth of 53 m, along with 36 additional piles measuring 1 m in diameter at a depth of 45 m. A successful offshore trial pile test with a load of 3,500 tons was also conducted to ensure the integrity of the structure. The project was successfully completed between December 2013 and June 2014.

Facts about the project
Company :

BAUER EGYPT S.A.E. Specialised Foundation Contractors

Location :

Aswan, Egypt

Project name :

Aswan Nile Bridge

Period :

December 2013 to June 2014

Services :

Bored Piles