The Aswan Nile Bridge required specialized offshore piling solutions to ensure the stability of its foundation. Bauer Egypt was tasked with executing the complex piling works, including the installation of 24 offshore piles with a diameter of 2 m at a depth of 53 m, along with 36 additional piles measuring 1 m in diameter at a depth of 45 m. A successful offshore trial pile test with a load of 3,500 tons was also conducted to ensure the integrity of the structure. The project was successfully completed between December 2013 and June 2014.
BAUER EGYPT S.A.E. Specialised Foundation Contractors
Aswan, Egypt
Aswan Nile Bridge
December 2013 to June 2014