References
Have you ever wondered how great projects become reality? Then you've come to the right place. Because we are building the world of tomorrow. Discover our success stories, innovations and the result of outstanding collaboration. Our projects inspire and reflect our passion for excellence. Find out how we turn our customers' visions into reality and deliver top performance in the process. Your next success story could start now!
Bauer Egypt executed 7,280 m² of diaphragm walls for al-Sokhna Power Plant and built a 75 m diameter, 30 m deep shaft to strengthen the foundation infrastructure.
Bauer Egypt secured and retrieved the buried TBM for Cairo Metro Line 3 by constructing a deep shaft and freezing the surrounding soil for safe excavation.
Bauer Egypt secured Cairo Metro Line 3 with 114,000 m² of diaphragm walls and crucial Soft Gel Grout Plug works, ensuring underground stability.
Bauer Egypt executed 8,300 m² of diaphragm walls and a 10 mgrout blanket for the Amiria Shaft, ensuring stability 32 m below groundwater.
Bauer Egypt completed crucial foundation work for Twin Towers in Tripoli, Libya, including diaphragm walls, deep piles and ground anchors.
Bauer Egypt built 28,000 m² of diaphragm walls for Istanbul's Uskudar Station, overcoming first-time challenges in tough soil and weather.
Bauer Egypt installed 2,252 bored piles for the Egyptian section of the International Coastal Road, connecting North Africa with the Middle East.
Bauer Egypt built the New Naga Hammadi Barrage, replacing a 1900s structure with 93,000 m² of diaphragm walls, cut-off walls and dewatering wells.
Bauer Egypt expertly installed additional foundation elements within an existing museum, utilizing advanced techniques to ensure structural integrity.
Bauer Egypt executed offshore piling for Al Wasta Nile Bridge, installing 600 piles up to 45 m deep, ensuring the stability of this key infrastructure project.
Bauer Egypt was tasked with constructing the new Damietta Metal Bridge with 88 offshore and 88 onshore piles, enhancing Nile crossing capacity and city infrastructure.
Bauer Egypt constructed 28,600 m² of diaphragm walls to eliminate traffic bottlenecks in Cairo’s El-Orouba Tunnel on Salah Salem Road.