Cairo Metro Line 3


Phase 3 A, B & C

Client:

  • National Authority for Tunnels

Main contractor:

  • Egyptian French joint venture for Cairo metro line 3

Construction period:

  • 2017 – 2020

Phase  description:

  • The Route of this phase extends from El-Attaba to Rod El-Farag corridor , passing through Al-Kit Kat up to Cairo University station of line 2.
  • The total length of this phase is about 17.7 km. , comprising 15 station, 8 of them are underground stations.
  • Bauer was awarded to execute the Diaphragm Wall & Ground Water control works of 7 stations .
  • The stations are located in Naser, Maspiro , Al-Zamalek, Al-Kit Kat, El Tawfikya and Gammeat El Dewal

Scope of Work:

  • Diaphragm walls 285,000 m2 depth form 55 to 96 m, thickness 100cm to150 cm
  • 7 circular shafts up to 96 m deep.
  • 136 Barrettes.
  • Soft gel plug 180,000 m3 of treated sand.