Cairo Metro line 3 phase 4


Cairo

Location:
Cairo


Client:
National Authority for Tunnels


Main contractor:
Egyptian French joint venture for Cairo metro line 3


Construction period:
2015 - 2016


Project description:
This phase of Cairo metro line 3 phase 4 consist of four stations (Heliopolis – Alf Maskan – Shams Club El Nozha), (4) Annexes, a cut & cover and an exit shaft.


Scope of Works:
• 72,800 m2 of diaphragm wall
• 105 Barrette with steel posts
• Soil treatment by using horizontal grout blanket for 3 stations
• Jet grouting & TAM for hard points