Location:
Suez Canal
Client:
Concord for Engineering and contracting
Consultant:
Consulting Engineering office
Year of construction:
2014
Project description:
Concord for Engineering and contracting company awarded Bauer Egypt the construction of 4 circular shafts for lunching and receiving the TBM required to construct 4 tunnels, each is 3.2 meter diameter to underpass the irrigation water canal (El - Sheikh Zayed Canal) under the new Suez Canal.
Scope of Works:
• Diaphragm Wall Works:
- Construction of 2 no DW shafts dia. = 18.3, Depth = 58 m
- Construction of 2 no DW shafts dia. = 18.3, Depth of 120 m
• Soft Gel Grout Plug Works
Supply & construct 2 no soft gel plugs at the deep shafts 120 m, plug thickness 10 meter.
• Micro piles works
Construct of 240 no of uplift piles capacity 120 ton to a depth of 120 m
BAUER EGYPT S.A.E.
Specialised Foundation Contractors
197, 26 July Street
El Mohandeseen
Cairo
Phone: +20(2)33026083
Fax: +20(2)33023805
E-Mail: baueregypt@baueregypt.com