2017 |
Baueregypt awarded the Diaphragm wall & Ground water control works for Cairo metro line (3). Phase 4 (6 under ground stations), the sum of the contract value about 900,000,000 EGP. Bauer reinforced its equipment fleets with the following additions:
|
2015 | Baueregypt awarded the Diaphragm wall & Ground water control for Ismailia tunnel project with the sum of the contract value about 520 million EGP |
2014 |
Bauer Egypt's equipment fleet is further reinforced with one new city trench cutter MC128. The new cutter capable to drill up to 120m with thickness up to 1.5 m, the cutter will execute 2 shafts for TBM with diameter on 18.2 m and depth 120m . the works are part of Sarapiuom Syphon under new Suez canal. |
2013 |
Bauer Egypt executed ( first time in EGYPT ) offshore piling with diameter of 200 cm for BANAH NILE BRIDGE. As well , based on this success BAUER awarded Aswan Nile bridge offshore piling with also 200 cm diameter and 53 m depth. Aswan Nile bridge has been successfully executed on year 2014. |
2012 |
Bauer Egypt awarded the geotechnical works for New Assuit Barrage. BAUER EGYPT has successfully executed the first cutter project with the new advanced system for Single phase cut off wall. |
2010 | Bauer Egypt's equipment fleet is further increased with the purchase of two advanced Anchors rigs; KR803 and KR806. |
2008 | Bauer Egypt’s equipment fleets enforced with 2 no BG28 rig with extend mast for one shot drilling up to 40 m. |
2007 | Bauer Egypt awarded, the most geotechnical demanding & prestigious project in Egypt, Cairo Metro Line 3,at a value of approx. 170 Million pound. Chemical grouting resources further increased with purchasing an advanced chemical grout station of 13 pump capacity & online mixing facilities. |
2004 | Bauer Egypt's equipment fleet is further increased with the purchase of the BG 30 piling rig and the BC 30 Trench Cutter. |
2003 | Bauer Egypt enforces its equipment fleet with two mini piling rigs for installation of bored piles in limited height & spaces |
2000 | Bauer Egypt's awarded the largest to date private sector project; The San Stefano Commercial and Residential Complex, at a value of approximately 120 Million Egyptian Pounds. |
1999 | Bauer Egypt's equipment fleet is further increased with the purchase of two advanced piling rigs; the BG 15 and the BG 40. |
1998 | Bauer Egypt's added a new activity (Permeation Grouting ) & enforced its equipment fleet with chemical Grouting Equipment’s. |
1997 | Bauer Egypt's added new activity (Under Water ground Anchors) equipment fleet is enforced with two additional Anchor drilling rigs and the advanced BC 30 Trench Cutter. The development and installation of Post grouted Ground Anchors under static water head. |
1995 | Bauer Egypt's added new activity (High pressure injection) & added new equipment for t Jet Grouting Bauer Egypt's first Tanking System project; Safir Hotel Extension, comprising of a laterally supported Diaphragm integrated with a horizontal Jet Grouting Blanket at its toe. |
1994 | Bauer Egypt's added a new activity (Diaphragm wall) and enforced its equipment fleet with Trench Cutter the BC 15. Bauer Egypt's first Diaphragm Wall project; Shafts for the Waste Water Project in Alexandria. |
1990 | Bauer Egypt's first off shore piling contract; Mansoura Bridge. |
1988 | BAUER EGYPT , Total no of Piling rig became 3 ( 2 no BG 11 + 1 BG 07 ) |
1981 | Bauer Egypt's establishment as a joint stock company between BAUER Spezialtiefbau GmbH and several Egyptian shareholders. Bauer Egypt's first piling contract: BAHER TOWER. The introduction and implementation of the Bauer System post Grouted Bored Piles. The introduction and implementation of the post grouted ground anchors as a reaction system for compression pile load tests. |