History

2017

Baueregypt awarded the Diaphragm wall & Ground water control works for Cairo metro line (3). Phase 4 (6 under ground stations), the sum of the contract value about 900,000,000 EGP.

Bauer reinforced its equipment fleets with the following additions:

  • (1) MC96 HDS 100
  • (2) Chemical grout containers
  • (2) BG28 with extended most
  • (1) BG40
 2015 Baueregypt awarded the Diaphragm wall & Ground water control for Ismailia tunnel project with  the sum of the contract value  about 520 million EGP 
 2014

Bauer Egypt's equipment fleet is further reinforced with one new city trench cutter MC128.

The new cutter capable to drill up to 120m with thickness up to 1.5 m, the cutter will execute 2 shafts for TBM with diameter on 18.2 m and depth 120m . the works are part of Sarapiuom Syphon under new Suez canal.

 2013

Bauer Egypt executed ( first time in EGYPT ) offshore piling with diameter of 200 cm for BANAH NILE BRIDGE.

As well , based on this success BAUER awarded Aswan Nile bridge offshore piling with also 200 cm diameter and 53 m depth.

Aswan Nile bridge has been successfully executed on year 2014.
 2012

Bauer Egypt awarded the geotechnical works for New Assuit Barrage.

BAUER EGYPT has successfully executed the first cutter project with the new advanced system for Single phase cut off wall.

 2010  Bauer Egypt's equipment fleet is further increased with the purchase of two advanced Anchors rigs; KR803 and KR806.
2008 Bauer Egypt’s equipment fleets enforced with 2 no BG28 rig with extend mast for one shot drilling up to 40 m.
2007 Bauer Egypt awarded, the most geotechnical demanding & prestigious project in Egypt, Cairo Metro Line 3,at a value of approx. 170 Million pound.

Chemical grouting resources further increased with purchasing an advanced chemical grout station of 13 pump capacity & online mixing facilities.
2004 Bauer Egypt's equipment fleet is further increased with the purchase of the BG 30 piling rig and the BC 30 Trench Cutter.
2003 Bauer Egypt enforces its equipment fleet with two mini piling rigs for installation of bored piles in limited height & spaces
2000 Bauer Egypt's awarded the largest to date private sector project; The San Stefano Commercial and Residential Complex, at a value of approximately 120 Million Egyptian Pounds.
1999 Bauer Egypt's equipment fleet is further increased with the purchase of two advanced piling rigs; the BG 15 and the BG 40.
1998 Bauer Egypt's added a new activity (Permeation Grouting ) & enforced its equipment fleet with chemical  Grouting Equipment’s.
1997 Bauer Egypt's added new activity (Under Water ground Anchors) equipment fleet is enforced with two additional Anchor drilling rigs and the advanced BC 30 Trench Cutter.

The development and installation of Post grouted Ground Anchors under static water head.
1995 Bauer Egypt's added new activity (High pressure injection) & added new equipment for t Jet Grouting

Bauer Egypt's first Tanking System project; Safir Hotel Extension, comprising of a laterally supported Diaphragm integrated with a horizontal Jet Grouting Blanket at its toe.
1994 Bauer Egypt's added a new activity (Diaphragm wall) and enforced its equipment fleet with Trench Cutter the BC 15.

Bauer Egypt's first Diaphragm Wall project; Shafts for the Waste Water Project in Alexandria.
1990 Bauer Egypt's first off shore piling contract; Mansoura Bridge.
1988 BAUER EGYPT , Total no of Piling rig became 3 ( 2 no BG 11 + 1 BG 07 )
1981 Bauer Egypt's establishment as a joint stock company between BAUER Spezialtiefbau GmbH and several Egyptian shareholders.
Bauer Egypt's first piling contract: BAHER TOWER.
The introduction and implementation of the Bauer System post Grouted Bored Piles.
The introduction and implementation of the post grouted ground anchors as a reaction system for compression pile load tests.